Fusion bonded epoxy Application.

Fusion bonded epoxy Application.

Step-01 Primer Application Prior to start fusion bonded epoxy application,the primer will be applied on the internal surface using an internal air spray machine.The oven will be preheated and temperature should be maintained in 180°C for at least 20 minutes prior to loading of primed materials. Primer Application Primer thickness …

Read More »

Surface preparation of Fusion bonded epoxy.

surface preparation

Visual Inspection of Metal Surface. QC Inspector/Coating supervisor shall visually inspect the condition of internal surface of all pipe fittings for verifying the items suitability for FBE surface preparation.If there is any items which is not meeting the above requirement mentioned in the document shall be identified and informed to …

Read More »